Mmamabula West

  • The 2.4 billion tonne Mmamabula West coal project contains some of the best quality coal in Botswana in two 4-6m thick seams at 100-150m depth
  • A prefeasibility study completed in March 2014 determined that low cost underground mining presents an opportunity for the production of a low-cost power station fuel from a conventional underground bord and pillar mine
  • The Company is currently the sole developer of this project, but is in discussions with international power developers who have expressed interest in participating in the Mmamabula West power project as a joint developer and equity partner